Number of visitors:


Optimized for browser:

Locations of visitors to this page

Petroleum refinery "Javornik"

Petroleum refinery be situated at the left periphery of railway station Javornik.
The kit of Piko company has 5 separate parts, which create one big complex.



The office

A kit of the office.

The fits of kit.

Instruction manual.

The wall with window and door.

The wall is built-up.

The wall with windows.

The wall is built-up.

The gable with bull´s eye.

The gable wall.

The external walls of the office.

The roof is glude-on.

The office is built-up.


Up


The fuel bunkers

A kit of the fuel bun-
kers.

The fits of kit.

Instruction manual.

The ladder with a fastening ty-
res.

A guard-rail.

Formation of the guard-rail.

A top cover of the bunker.

The fuel pipelines.

The fuel bunker is
built-up.


Up


The cracking-equipment

A kit of the cracking
-equipment.

Fits of the kit.

Instruction manual.

Formation of a ladder.

Bondes of bunker are
signed by sticky tape.

Tower No. 1.

Towers No. 2 a No. 3.

Connecting galerries.

Bottom part of a to-
wer No. 4.

Tower No. 4.

Tower No. 5.

A gangoard.

Cracking-equipment.

Cracking-equipment.

Cracking-equipment.


Up


The tanks

A kit of tanks.

The fits of kit with an instruction
manual.

The tanks are built-up.

The tanks on stanchions.


Up


The feed arrangement

A kit of feed arrangement.

The fits of kit.

Instruction manual.

A parts of steel structure.

A cradles are built-up.

A terrace steps with banisters.

A parts of gangoard.

Agglutination of a banisters.

The steel structures are glued-on
to gangoard.

The feed arrangement is glued
-on to a baseplate.

The feed arrangement is built-up.


Up