Number of visitors:
Optimized for browser:
The second kit in from Polaproduction too.
The fits are stored in the box.
Instruction manual is simplerthan "Susch" instruction manual.
I cut out foil slightly more thanwindow. I trimed this foil after get dry.
Before sticking is useful press foilto door-case. The stick run to right side up failing which.
Single pieces are ready for shel-ter completion.
I check right angles by steelsquare.
Settlement of the crane floor in-cluding chain intertwined.
Fixative for correct operation.
I used steel square for gluing ofthe bunkers.
Two hutches for coal transporta-tion.
Setting of the equipment.
Crane girders is better glued-upbefore compilation.
The coal-loading equipment.
The coal bunkers.
Detail of the crane.
Detail of the engineroom.