Number of visitors:


Optimized for browser:

Locations of visitors to this page

Signal box "St1 a St2 Javornik"

A familiar package of kit from
Pola productiuon.

The fits are stored in the box.

Instruction manual.

The windows and the door of
ground floor with glassware.

Walls of groud floor with the
windows.

The ground floor is glued-up to
the bolster.

The windows of the 1st floor.

Walls and flooring of the 1st
floor.

The 1st floor is completed.

The stairs up to 1st floor with a
stair head and banisters.

The signal box with glued-up the
1st floor and the roof.

The signal box is completed.

A front view.

Detail of the stair head and the
door.

A view onto stairs.


Up