|
The manipulation track at Orechov
|
I finished manipulation track laying with ware house at station Orechov in the spring.
|
An aerth removing under the track. |
A rubble laying. |
Cross switch and track laying. |
I overwhelm track with brash and I check on gradient
by water-level. |
A ware house with trap sidings. |
I thought up the covered engine house for easier driving out and driving in.
Trains of wagons will temporarily deposit on this engine house. Trains of wagons
will driving in the engine house from the left gridiron of station Orechov.
|
Triangulation of branch to future engine house. |
I have to cut place for track into paving. |
Test track laying. |
Deeping of the substructure. |
The track banking along the flower-bed. |
The ballast laying. |
The ballast laying. |
The test run. |
A gap to the engine house. |
Layout of the ground high. |
A new pavage laying. |
The railway line in pavage. |
The railway line in pavage. |
A future entrance of the engine house. |
Mr Chudoba is building a buttress wall with a pavement. |
A buttress wall under construction. |
A buttress wall under construc- tion. |
A butress wall with pavement. The pavement is overside for put
down foot. |
The railway track between butress walls. |
The railway track between butress walls. |
The engine house entrance. |
The tunel portal. |
I started a planned rebuilding of bridges this year. The bridge No. 3 was first,
because it is by the entrace to the garden. It should be grip a visitors.
Construction of the bridge is very complicated, because the bridge ensure two
lines crossing in a curve and the upper line is in the uprising. I resolved
to build a bridge "bespoke" by Mr Chudoba. He is a specialist for sandstone
constructions. You can see his web pages
www.gardenrailways.cz
for more informations.
Mr Chudoba aquited oneself this project by verve inhere. Structure of the bridge
it began and it was gradually extendable to view terrace with cover of cabling.
|
Bridge No. 3. It was construction as provisory. |
A lots of new bridge engendered at Mr Chudoba´s workroom in Jaromer. |
First testing compilation of the bridge. |
Field engineering for integration of the bridge pillars. |
Concrete socket of the bridge pillars. |
Mr Chudoba is notching bridge pillars. |
I made a cable shifting (twin cable 2x 1,5mm) from power source to station
Orechov during the rebuilding. The first pair I used for current supply of track,
odd three pairs are us reserve.
|
The cables are in a protector under the pavement. |
Cables on the power source side. |
Cables in station Orechov. |
Cables ending in cable box and supply of track. |
Cables laying under the track towards signal box. |
Cables ending under the signal box Orechov. |
Testing compilation of the front plate. |
Cutting out ... |
... and grinding of socket. |
The first bridge pillar is fix. |
Settling of bridge pillar. |
Bottoms of pillar are settle. |
Top parts of pillar are settle. |
Side part of bridge with embrasure. |
Connection of side part onto bridge pillar. |
Side buttress wall. |
Incoming view onto the bridge. |
Front view. |
A view onto inside curve. |
Stairs onto terrace. |
Terrace of the bridge. |
Top section of the bridge. |
Inside section of the bridge. This section will overwhelm with
ballast after cable laying. |
Top section of the bridge. |
Top section of the bridge. |
A curve in top section of the bridge. |
|